Projects - 1997

Company Description Prime Contractor Project Management Personnel Hardware
Apache Energy Ltd East Spar #1 Wellhead Maintenance      
Apache Energy Ltd East Spar Third Well Development Planning    
CorrOcean Ltd CP Engineering – Myanmar    
Apache Energy Ltd Pipeline Stabilisation Engineering      
Apache Energy Ltd Installation Engineering (East Spar #4 WH)      
DoME – WA Diving Inspector      
DoME – WA Atmospheric Dive System Audit      
Tiwest JV Coolaroo Mine Site, Inwater Hull Survey  
Contract Diving Services Expert Witness (Diving)      
Apache Energy Ltd Diving Consulant (Stag)      
Coflexip Stena Offshore Satellite Communications Systems      
BHP Petroleum Saturation Diving Audit      
Cultus Petroleum NL Diving and Vessel Audit      
CorrOcean Ltd CP Engineering – Shetland Islands    
Transfield Worley CP Equipment      
Maersk Contractors Preparation for Stag Geotechnical Investigation prior to Jack Up Placement    
Apache Energy Ltd Harriet Tanker Mooring Leg Repair      
Woodside Offshore Petroleum Lambert Early Tie Back Project      
Apache Energy Ltd Stag Well Conductor Insert Design and Fabrication  
Apache Energy Ltd 1997 East Spar Facilities and Pipeline ROV Baseline Inspection
Apache Energy Ltd Stag Field – Subsea Production Facilities Diving Operations Review      
Woodside Offshore Petroleum Wanaea and Cossack Field, Diving Operations Review      
Woodside / Fugro 2nd Trunkline Geotechnical Investigation (Drilltrack)    
Apache Energy Ltd East Spar Inshore ROV Pipeline Inspection  
Esso – BHPP Marine Operations Strategic Management Plan      
Apache Energy Ltd Harriet Tanker Mooring Removal, Maintenance and Replacement  
Clyde Petroleum Client Representation and Offshore Management      
Apache Energy Ltd Harriet Field Platform Inspection 1997  
Apache Energy Ltd Campbell Monopod Production Pipeline Repair and Tie-in  
Apache Energy Ltd / Contract Diving Services Wonnich Geotechnical Site Survey (Drilltrack)    
CSR Pipeline Stabilisation Mat- Performance Study